Electric:
Service Provider: Village of Versailles
Transmission Voltage: 69kV
Location: At Site
Primary Distance (ft): At Site
Dual Feed Availability: Yes
Distribution Voltage: 12,470/4,160
Delivery Voltage: 120/240V (1Ø); 120/208V (3Ø); 277/480V (3Ø); 120/240V (3Ø)
Rates Available: Click Here.
Natural Gas:
Service Provider: Vectren Energy Delivery
Water:
Service Provider: Village of Versailles
Location: On Site
Main Size (in): 6” – 12”
Line Size (in): 8”
Pressure (psi): 55
Static Pressure (psi): 55-61
Residential Pressure (psi): 55
Flow per Minute (gal): 850
Booster Pump: No
On-Site Storage: No
Storage Elevated: 1 million gal.
Storage Capacity: Plus clear well 1.225 million
Source: Wells
Related Capacity (gal): 1.5 MGD Plant
Peak Demand (GPD): Avg for 2017 to date 0.712 MGD
Rates: Click Here
Sewer:
Service Provider: Village of Versailles
Location: On Site
Main Size (in): 8” – 21”
Line Size (in): 8”
Treatment Plant Type: Activated/Sludge/ext
Treatment Method: Activated/Sludge/ext
Use of Lift: Yes
Rated Capacity (gal): 0.750 MGD
Rates: Click Here
Storm Sewer:
Storm Drainage: 10” -72”
Storm Drainage Location: Swamp Creek
Waste Disposal:
Refuse, recycling, and cardboard provided by the Village of Versailles
April
07
Temporary Seasonal Lifeguard Positions
Fri, 04/07/2023 - 4:30pmApril
10
Board of Zoning Appeals
Mon, 04/10/2023 - 6:30pmApril
19
Homer, Wood & Harrison Road & Waterline Imp. project Bid Opening
Wed, 04/19/2023 - 10:00am